Heavy Haul for Ports & Logistics: Moving Terminal Equipment Nationwide

Seaports, inland ports, intermodal terminals, and logistics hubs rely on specialized equipment that is among the heaviest and most dimensionally challenging freight on the highway. R&RM LLC, in business since 2011, provides superload permitting, multi-axle trailer configurations, and project logistics for port and cargo handling equipment moves across all 48 continental states.

Get a Quote (404) 987-6225

The Port Equipment Transport Challenge

Port and logistics terminal equipment occupies a unique position in the heavy haul universe. The machines that move containers, stack freight, and service vessels at seaports, river terminals, and intermodal yards are purpose-built for their operating environment — they are engineered to work in a confined, densely-paved terminal footprint, not to travel on public roads. When these machines need to be relocated — for a new terminal installation, a maintenance contract, an equipment overhaul at a distant facility, or a sale to another port — the transport challenge is formidable.

Rubber-tired gantry cranes, ship-to-shore crane components, straddle carriers, reach stackers, and large empty container handlers are routinely among the heaviest and widest loads that move on US highways. Many require superload permits — moving beyond the standard oversize permit process into engineering study territory. All require careful trailer selection, and many require disassembly to manageable transport dimensions. R&RM LLC has the experience with oversize load transport and permit services to manage these complex moves from planning through delivery.

Rubber-Tired Gantry Crane (RTG) Transport

Rubber-tired gantry cranes are the defining piece of equipment at modern container terminals — the tall rolling frames that stack containers six or seven high across the stacking lanes of a yard. RTG cranes are manufactured by Kalmar, Konecranes, Shanghai Zhenhua Heavy Industries (ZPMC), Mi-Jack Products, and others. When an RTG crane must be relocated over public roads — typically for a terminal expansion, a sale between ports, or a move to a new inland facility — the transport challenge is significant.

RTG Transport Dimensions and Permit Requirements

RTG cranes designed for standard 6-wide container stacking configurations typically stand 60–80 feet tall in operating configuration, which is obviously not a road-legal height. To transport an RTG crane on public highways, the following disassembly steps are typically required:

RTG crane transport moves are planned as project freight operations, not routine permit loads. R&RM LLC coordinates with the terminal operator's maintenance contractor, the crane manufacturer's service team, and state DOT permit offices across the route states to develop a compliant transport plan. These moves typically require 2–6 weeks of permit and logistics preparation time, depending on route complexity and the number of states transited.

Mobile Harbor Cranes

Mobile harbor cranes — Liebherr LHM series, Gottwald G HMK series (now Konecranes), Sennebogen 8130–8200 series — are self-propelled rail-mounted or rubber-tired cranes used at general cargo terminals, bulk cargo facilities, and smaller ports that do not operate ship-to-shore bridge cranes. These cranes range from approximately 100 tons to 300+ tons capacity, with transport dimensions that place them firmly in superload territory.

When a mobile harbor crane must be relocated over public roads — separated from its rail or quay mounting for transport — the typical approach is:

Mobile harbor crane moves are among the most complex heavy haul projects undertaken on US highways. They require close coordination with state DOT permit engineers, often bridge weight analysis on the route, and escort vehicle arrangements that may include law enforcement accompaniment through populated areas. R&RM LLC has the permit coordination experience to plan these moves and manage the logistics across multi-state routes. See our guide to superload permits for a detailed look at how the engineering study and permit approval process works for these extreme loads.

Reach Stackers

Reach stackers are the most commonly transported piece of port equipment in terms of annual move volume. These large container-handling machines — Kalmar DRF and DCG series, Konecranes SMV series, Hyster RS series, Taylor TX series — are used at container depots, intermodal yards, inland ports, and smaller coastal container terminals. Operating weights run from approximately 80,000 lbs for smaller 35-ton capacity units to 150,000 lbs or more for top-capacity 45-ton units.

Reach Stacker Transport Specifications

Empty Container Handlers

Empty container handlers — also called empty container lift trucks or empty stackers — are large reach trucks designed to lift and stack empty ISO containers. Kalmar, Konecranes, Hyster, Taylor, and Fantuzzi manufacture the primary models used at US ports and depots. These machines weigh 65,000–110,000 lbs operating weight and present similar transport challenges to reach stackers, with transport widths and heights requiring oversize and overweight permits and escort vehicles on most routes.

Key transport considerations for empty container handlers:

Straddle Carriers & Van Carriers

Straddle carriers — Kalmar, Konecranes, and Terberg models — are tall, narrow portal vehicles that lift and carry containers by straddling them between their four leg posts. These machines are common at mid-size to large container terminals as a bridge between the ship-to-shore crane and the yard stacking system. Transport of straddle carriers over public roads involves some of the most extreme dimensions in port equipment transport.

In operating configuration, a straddle carrier typically stands 30–50 feet tall. For highway transport, the portal frame and cross-beam must be lowered, and in many cases the leg assemblies are removed and transported separately. Even in a maximally collapsed transport configuration, straddle carriers commonly run 15–20 feet tall and 14–20 feet wide — placing them firmly in superload permit territory requiring engineering review in each state on the route. The move planning process for a straddle carrier transport is similar in complexity to an RTG crane move: several weeks of permit preparation, route survey, bridge load analysis, and law enforcement coordination are typically required. See our equipment page on straddle carriers and port equipment for a more detailed breakdown of transport specifications.

Intermodal Terminal Equipment

Beyond the large crane and container handling machines, intermodal terminals and logistics facilities rely on a broad range of heavy equipment that moves between facilities with more routine frequency:

Key Ports and Logistics Hubs in Our Service Area

R&RM LLC is based in Cumming, Georgia, well-positioned to serve the major port and logistics markets of the Eastern and Gulf Coast United States, as well as the inland intermodal corridor from the Southeast through the Midwest.

Permit Planning for Port Equipment Moves

Port and logistics equipment moves require more permit preparation time than most heavy haul jobs because of their extreme dimensions and weights. Key planning considerations:

Multi-State Permit Coordination for Port Projects

Port expansion and terminal modernization projects often involve multiple large equipment deliveries over an extended project timeline — a new terminal might receive ten RTG cranes over a 12-month installation schedule, with each crane requiring a separate transport from the port of entry or manufacturer's facility. Coordinating a stream of superload permits across the same route for a construction project requires maintaining relationships with the permit offices in each state on the route and managing permit validity windows so that each crane's permits are valid for its specific transport date.

R&RM LLC manages multi-delivery project permit coordination for port construction and terminal expansion projects, using our established relationships with permit offices and service agents in all 48 states developed since 2011. See our guide to multi-state oversize permit coordination for a full breakdown of how we manage long-haul permit logistics.

Working with Terminal Operators and Project Managers

Port equipment moves are almost always coordinated with a terminal operator's project management team, maintenance contractor, or crane vendor's installation crew rather than arranged directly by an individual shipper. The heavy haul carrier's role in a port equipment project includes:

R&RM LLC is experienced working in the project logistics environment that port equipment moves require. We provide documentation, attend coordination meetings, and interface directly with terminal operations teams throughout the transport process.

Get a Port Equipment Transport Quote

To quote a port or logistics equipment transport, provide: equipment type and model; operating weight and transport dimensions (or the ability to have our team look up manufacturer specifications); current location (terminal name, city, state); delivery location; whether the machine is operational; and project timeline. For large port equipment projects involving multiple machines or multi-state superload moves, early engagement — 6–8 weeks before the target transport date — allows time for proper permit preparation and route planning.

Call R&RM LLC at (404) 987-6225 or request a quote online. We handle oversize transport, overweight transport, permit services, and pilot car coordination across all 48 continental states.